All Achievements | International Engineering | Comprehensive Traffic Planning | Road Engineering | Bridge Engineering | Municipal Engineering | Building Engineering | Tunnel and Underground Engineering |
Project Supervision | Traffic Engineering And Logistics Engineering | Inspection And Reinforce | Project Survey | Project Mapping | Marine Traffic Engineering | Digital Image Service |
The bridge is located in the urban area of Debiganj, across the Kaluoduowa River. The bridge is 1152.4m in total, including a main bridge with the length of 577.4m and the width of 10m, and an approach bridge with the length of 575m from east to west. The design speed is 65km/h and the investment amounts to 70 million Yuan. Debiganj Highway Bridge, the superstructure of main bridge adopts prestressed concrete continuous structure with a span of 25+13*40+25 m. It has been completed in December 1997.