Inner Ring Road Reconstruction in Katmandu, Nepal
Time:Mar 25,2015Hits:Hits:-

Feasibility Study

2009.12-2010.4

This project is in Katmandu, the capital of Nepal, with a total length of 26669m and a design speed of 50km/h. The project evolves maintenance and reconstruction on 8 main bridges, construction of 16 new auxiliary bridges, 22 new subsidiary culverts and 261 new ditch culverts, also includes building 3 new simple urban interchanges, 5 new overpasses and a new pedestrian box culvert.

Inner Ring Road Reconstruction in Katmandu, Nepal

Inner Ring Road Reconstruction in Katmandu, Nepal

Inner Ring Road Reconstruction in Katmandu, Nepal

Inner Ring Road Reconstruction in Katmandu, Nepal